"Product Catgeory","portable emergency lighting sysetem" "Product Name","emergency light" "Specification Title","Specification Value" "Availibality of Patent rights from Shri SANJEEV MITAL r/o, Plot no. 102, Aditya hill top residency, huda height, MLA colony road no 12, banjarahills, Hyderabad- 500034, who have purchased Patent Right in India for Inflatable Emergency Lighting System vide Patent No. 191538 Dt- 16.02.1999 shri GUIDO MEDICI of E.I.L System Itealy.",Yes "Licence No",na Date,12/01/2010 "Model No",NA "Generator Set: Recoil Starting Portable AC Generating Set Comprising AC Generator rated of different VA 230V 1 Phase of unit Power Factor Conforming to IS: 13364(part 1/92) and petrol Run air Cooled four Stroke singal cylinder engine with resettable circuit breaker in the AC output.",Yes "Genetor Power Output",1200 "Fuel tank capacity for continuous running of Genrating set for 8 hours.",Yes "A fuel level indicator should be on display panel.",Yes "System also work on 220/230V 50 Hz AC mains with provision for 3-pin socket Rating and a suitable lead wire with plugs at both ends.",Yes "No. of compressors/air blowers of suitable rating",Two "Maximum Time Taken to Inflate the balloon",60 "Balloon shall be cylinderical shaped made of suitable polyster based cloth to ensure emission of light with minimum loss and shall be waterproof and strengthened with flexible stiffereners to sustain inside air pressure and to remain erected against outside wind speed .",Yes "Outside Wind Speed at which the balloon shall remain erected.",45 "High pressure Metal Halide(HPMH) lamp shall be mounted inside the balloon at the top end such that it goes up/down while inflating and deflation.",Yes "Lamp wattage",400 "Lamp Lumens.",42000 "Balloon height in inflated condtion from base plate. .",NA "The length of nylon rope supplied for the stays.",5 "Rope dia",3 "No. of Rope",3 "Control Gear shall be suitable designed and fitted with MCB, lamp ballast, ignitor , capacitors, changeover and on/off switches with indicating lamps for controlling HPMH lamp and air blowers.",Yes "Max total weight of complete system: (excluding storage box).",50 "Overall dimensions in deflated condition (nominal):","600 x 450 x 500" "Base Frame shall consist of MS tube frame and a base plate of aluminium sheet of thickness to support generating set and control gear box and shall be provided with anti vibration rubber pads. M.S. Parts shall be powder coated.",YES "Base Plate: - Sheet Thickness of Aluminium Base Plate.",3 "Top Cover : Made of moulded fibre glass or suitable material designed to fasten the tower balloon by suitable steel strip so that there is no air leakage at the joint. It shall provide suitable nipple/hole for filling air into the balloon and provide support for it to remain erect at wind speed of 45 km/hr.",Yes "Radius up to which min. lux value of 1 shall be available after 5 minutes of Starting.",55 "Maximun Deflation time including repacking time",5 "The Inflated tower only shall be rain proof",Yes "Ingress protection rating of the Inflated tower as per IS:10322 (Part 1/82).",IPX5 "The System shall be suitable for continious running for 8 hours, without adversaly affecting the components.",Yes "Accessories : part of supply with the main equipments.",Yes "Storage Box : Suitably designed to accommodate the tower and other spare & easy to handle with proper locking arrangements.","One No" "Rain protectin cover : For generating set and control gear box made of waterproof cloth with air vent arrangements.","One No" "Tool Kit : Consisting of one no. each of screw driver, plug spanner & nut driver.",Yes "Puncture Repair Tape :","03 Nos." "Puncture Repair Tape Size: 10cm x 10 cm",Yes "Lamp with requisite control gear.","One No" "No. of blower.","One No." "Availability of Test Reports from Central Govt./State Govt/NABL/IL AC accredited Lab to prove conformity to the specification Type test Reports shall consist of (1) Verification of all the feature& functional parameters. (2)Type tests for alternator as per IS:13364/(part 1)/1992(Reaffirmed 2003) excluding tests as per clause 20.4.1 b, d, e, m&p of IS:13364(pt 1)/1992 , (3) Type tests for Engine as per clause 9.1 of IS:7347/1974(Reaffirmed in 2006) ,(4) Inflated tower or luminaire shall be with IP-X5 protection as per IS:10322/ pt 1/82"",Yes "Test report no",NA "Test report date",na "Name of lab",na "Address of the lab",na