UNILINE, 15 KVA Online UPS system, Three Phase I/P Three Phase O/P, along with SMF Battery Bank VAH 12000 to provide 30 Minutes Backup Time. unilineMaxipro-15-TT-HH.
Other Specifications Download Specification | |
---|---|
Rating In KVA | 15 KVA |
Technology | IGBT-PWM with inbuilt isolation transformer |
Input Power | Three phase 300 V - 450V sinewave,50Hz |
Output Power | 3 phase 400 V ±1% with alternative user setable setting of 380V+-1%,50Hz |
Backup Time | 30 Minutes |
Minimum VAH | 12000 VAH |
Voltage Regulation From No Load To Full Load | 1 % |
Inbuilt Isolation Transformer | Yes |
20% Overload Limit For Minimum 10 Minutes | Yes |
50% Overload Limit For Minimum 1 Minutes | Yes |
Total Harmonic Distortion(THD) | 1.7 % |
Overall Efficiency | 93 % |
Type Of Battery | SMF-VRLA conforming to JISC:8702(Pt.I,II&III) |
Minimum Thickness Of M.S.Sheet Enclosure Duly Painted | 1.2 mm |
Degree Of Protection | IP21 |
Protection Of Over Voltage,Short Circuit & Over Load At UPS Output Terminal | Yes |
Protection For Under Voltage At Battery Terminal At 10.5V Per 12 V Battery. | Yes |
Maximum Overshoot And Under Shoot Of Output Rated Voltage | 4 |
Indicators For Mains Presence,Battery Charging And Discharging,Output Over Load, Low Battery Voltage | Yes |
Digital Metering In UPS For AC Input Voltage,Output AC Voltage,Current,Frequency,Battery Voltage And Current | Yes |
Movable Trolly For Batteries | Without |
Dry Heat Test : In Accordance With IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) At 55 Degree C For 16 Hrs | Yes |
Damp Heat : In Accordance With IS:9000(part 5/sec.2)1981 At Temperature Of 40 Degree C,two Cycles Of (12+12) Hours Each 2007) | Yes |
Cold Test : In Accordance With IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) At -10 Degree C For 4 Hrs. | Yes |
Availability Of The Type Test Report From Central Govt. /NABL/ILAC Accredited Lab Covering All Technical Requirements. | Yes |
Type Test Certificate No. | 50689-E |
Type Test Certificate Date | 06-05-2016 |
Name Of Lab | NTH |
Address Of Lab | GHAZIABAD |
Supply & Commissioning | UPS & BTY SHALL BE INSTALLED BY OUR ENGINEER AT SITE, BUT SITE SHALL BE GOT PREPARED FOR INPUT & OUTPUT ELECTRICAL WORK BY THE CONSIGNEE/INDENTOR |
Warranty | 1 Years |