× All the transactions performed on 2.0 is available here. To access Market click "Home".

20 kva online ups, backup 60 minutes (dextan)(dextan systems Austin tt 10kva - 20kva 3 to 1 phase UPS1)

` 533,970.00

  • MRP: `675500.00

20 KVA Online UPS Three Phase Input, Single Phase output, Inbuilt Isolation transformer, with SMF Batteries Backup 60 Minutes..

  • Availability: 10 In Stock
  • Min. Qty. Per Consignee: 1
  • Technology - IGBT-PWM with inbuilt isolation transformer
  • Input Power - Three phase 300 V - 450V sinewave,50Hz
  • Output power - single phase 230V 1 sinewave,50Hz
  • Minimum VAH - 32000 VAH
  • 20% Overload limit for minimum 10 minutes - Yes
Other Specifications Download Specification
Rating In KVA 20 KVA
Technology IGBT-PWM with inbuilt isolation transformer
Input Power Three phase 300 V - 450V sinewave,50Hz
Output Power single phase 230V 1 sinewave,50Hz
Backup Time 60 Minutes
Minimum VAH 32000 VAH
Voltage Regulation From No Load To Full Load 01 %
Inbuilt Isolation Transformer Yes
20% Overload Limit For Minimum 10 Minutes Yes
50% Overload Limit For Minimum 1 Minutes Yes
Total Harmonic Distortion(THD) 2.3 %
Overall Efficiency 93 %
Type Of Battery SMF-VRLA conforming to JISC:8702(Pt.I,II&III)
Minimum Thickness Of M.S.Sheet Enclosure Duly Painted 1.2 mm
Degree Of Protection IP21
Protection Of Over Voltage,Short Circuit & Over Load At UPS Output Terminal Yes
Protection For Under Voltage At Battery Terminal At 10.5V Per 12 V Battery. Yes
Maximum Overshoot And Under Shoot Of Output Rated Voltage 4
Indicators For Mains Presence,Battery Charging And Discharging,Output Over Load, Low Battery Voltage Yes
Digital Metering In UPS For AC Input Voltage,Output AC Voltage,Current,Frequency,Battery Voltage And Current Yes
Movable Trolly For Batteries With
Dry Heat Test : In Accordance With IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) At 55 Degree C For 16 Hrs Yes
Damp Heat : In Accordance With IS:9000(part 5/sec.2)1981 At Temperature Of 40 Degree C,two Cycles Of (12+12) Hours Each 2007) Yes
Cold Test : In Accordance With IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) At -10 Degree C For 4 Hrs. Yes
Availability Of The Type Test Report From Central Govt. /NABL/ILAC Accredited Lab Covering All Technical Requirements. Yes
Type Test Certificate No. #1,we will provide
Type Test Certificate Date 2018
Name Of Lab Nisaki technologies
Address Of Lab Bangalore
Supply & Commissioning Technology - Double Conversion IGBT Pure sine wave UPS Input Power - Three phase 300 V - 450V sinewave,50Hz, Output power - single phase 230V ±1 sinewave,50Hz,Supply & commissioning - UPS & Batteries shall be installed by us at site, Warranty - 5 Years
Warranty 4 Years

Price Dekho Price Dekho Price List in india